North Of Hill Farm Wacton Road Forncett St Peter, Norfolk, NR16 1JD
Hill Farm, Wacton Road - Battery Energy Storage System is a 120 MW battery storage project in Eastern. The applicant or operator on record is Green Switch Capital Limited. Planning permission has been granted as of March 2026 and it is awaiting construction. The determining authoβ¦
Consented / Approved
Project stageConsented
PlanningApr 2025 (completed)
ConsentedMar 2026 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-05-08.
Registered planning capacity; not measured generation.
Hill Farm, Wacton Road - Battery Energy Storage System is a 120 MW battery storage project in Eastern. The applicant or operator on record is Green Switch Capital Limited. Planning permission has been granted as of March 2026 and it is awaiting construction. The determining authority is South Norfolk, reference 2025/1152.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
120.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Green Switch Capital Limited
Owner / operator
Green Switch Capital Limited
Year consented
2026
Location
North Of Hill Farm Wacton Road Forncett St Peter, Norfolk, NR16 1JD