N/O Butterfly Lane, Land Surrounding Hilfield Farm And Land West Of Hilfield Lane Aldenham, Hertfordshire, WD25 8DA
Hilfield - Solar arrays & Battery storage is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Elstree Green Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Hertsmere, reference 22/0948/FULEI.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMay 2022 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2024-07-01.
Registered planning capacity; not measured generation.
Hilfield - Solar arrays & Battery storage is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Elstree Green Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Hertsmere, reference 22/0948/FULEI.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Elstree Green Limited
Owner / operator
Elstree Green Limited
Location
N/O Butterfly Lane, Land Surrounding Hilfield Farm And Land West Of Hilfield Lane Aldenham, Hertfordshire, WD25 8DA