Farmland South Of Litlington, South Camb, Royston, Hertfordshire, Cambridgeshire
Highfield Wind Farm is a 12.5 MW onshore wind project in Eastern. The applicant or operator on record is Highfield Wind Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is South Cambridgeshire, reference S/0439/12/FL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMar 2012 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Withdrawn.
Official register: July 2026
Recorded status: Appeal Withdrawn. Source record updated 2014-09-05.
Registered planning capacity; not measured generation.
Highfield Wind Farm is a 12.5 MW onshore wind project in Eastern. The applicant or operator on record is Highfield Wind Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is South Cambridgeshire, reference S/0439/12/FL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
12.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Highfield Wind Energy Limited
Owner / operator
Highfield Wind Energy Limited
Location
Farmland South Of Litlington, South Camb, Royston, Hertfordshire, Cambridgeshire