Highfield Wind Farm is a 12.5 MW onshore wind project in Eastern. The applicant or operator on record is Highfield Wind Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is South Cambridgeshire, reference S/0439/12/FL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningMar 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Withdrawn.

Official register: July 2026

Recorded status: Appeal Withdrawn. Source record updated 2014-09-05.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

12.500 MW
Registered Capacity

πŸ“‹ Project Overview

Highfield Wind Farm is a 12.5 MW onshore wind project in Eastern. The applicant or operator on record is Highfield Wind Energy Limited. The application has been withdrawn or the scheme abandoned. The determining authority is South Cambridgeshire, reference S/0439/12/FL.

Site Schematic

EASTERN Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)12.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperHighfield Wind Energy Limited
Owner / operatorHighfield Wind Energy Limited
LocationFarmland South Of Litlington, South Camb, Royston, Hertfordshire, Cambridgeshire
RegionEastern
Coordinates52.056447Β°N, 0.0878029Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2.5
No. of Turbines5