Solar Farm

Higher Humber Farm

Humber Lane, Bishopsteignton, Devon, Devon, TQ14 9TD

Higher Humber Farm is a 5.9 MW solar farm project in South West. The applicant or operator on record is TGC Renewables. The planning application was refused. The determining authority is Teignbridge, reference 14/03725/MAJ.…

Refused
Project stageRefused
  1. PlanningJan 2015 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2017-02-28.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.900 MW
Registered Capacity

πŸ“‹ Project Overview

Higher Humber Farm is a 5.9 MW solar farm project in South West. The applicant or operator on record is TGC Renewables. The planning application was refused. The determining authority is Teignbridge, reference 14/03725/MAJ.

Site Schematic

SUBSTATION ? ha Β· 5.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTGC Renewables
Owner / operatorTGC Renewables
LocationHumber Lane, Bishopsteignton, Devon, Devon, TQ14 9TD
RegionSouth West
Coordinates50.5626404Β°N, 3.5723855Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)175000

πŸ“… Project Timeline

2015-01-06