Land At E 378449 N 121922, Fifehead Magdalen, Higher Farm Fifehead, Gillingham, Dorset, Dorset, SP8 5RR
Higher Farm is a 11 MW solar farm project in South West. The applicant or operator on record is NextPower Higher Farm Limited. The planning application was refused. The determining authority is Dorset, reference 2/2019/0470/FUL.β¦
Refused
Project stageRefused
PlanningApr 2019 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2020-09-25.
Registered planning capacity; not measured generation.
Higher Farm is a 11 MW solar farm project in South West. The applicant or operator on record is NextPower Higher Farm Limited. The planning application was refused. The determining authority is Dorset, reference 2/2019/0470/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
11.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
NextPower Higher Farm Limited
Owner / operator
NextPower Higher Farm Limited
Location
Land At E 378449 N 121922, Fifehead Magdalen, Higher Farm Fifehead, Gillingham, Dorset, Dorset, SP8 5RR