High Wood Wind Farm, Dalton, Driffield, Humberside, Humberside, YO25
High Wood Wind Farm is a 25 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is EDF Energy Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshire, reference 15/00315/STPLFE.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningFeb 2015 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2015-09-02.
Registered planning capacity; not measured generation.
High Wood Wind Farm is a 25 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is EDF Energy Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshire, reference 15/00315/STPLFE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
25.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
EDF Energy Renewables
Owner / operator
EDF Energy Renewables
Location
High Wood Wind Farm, Dalton, Driffield, Humberside, Humberside, YO25