Solar Farm

High Trees Farm

High Trees Farm, Proposed Solar Farm, North West Of Tasley Bridgnorth, Shropshire, Shropshire, WV16 4RE

High Trees Farm is a 3.8 MW solar farm project in West Midlands. The applicant or operator on record is Green Switch Developments. The planning application was refused. The determining authority is Shropshire, reference 14/02386/FUL.…

Refused
Project stageRefused
  1. PlanningMay 2014 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2015-10-29.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.800 MW
Registered Capacity

πŸ“‹ Project Overview

High Trees Farm is a 3.8 MW solar farm project in West Midlands. The applicant or operator on record is Green Switch Developments. The planning application was refused. The determining authority is Shropshire, reference 14/02386/FUL.

Site Schematic

SUBSTATION ? ha Β· 3.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)3.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Switch Developments
Owner / operatorGreen Switch Developments
LocationHigh Trees Farm, Proposed Solar Farm, North West Of Tasley Bridgnorth, Shropshire, Shropshire, WV16 4RE
RegionWest Midlands
Coordinates52.5464124Β°N, 2.4502659Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)84400

πŸ“… Project Timeline

2014-05-30