High Rigg Solar Farm - Solar Panels is a 30 MW solar farm project in North West. The applicant or operator on record is Noventum Power Limited. The planning application was refused. The determining authority is Westmorland and Furness, reference 2025/1267/FPA.β¦
Refused
Project stageRefused
PlanningJul 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2026-04-27.
Registered planning capacity; not measured generation.
High Rigg Solar Farm - Solar Panels is a 30 MW solar farm project in North West. The applicant or operator on record is Noventum Power Limited. The planning application was refused. The determining authority is Westmorland and Furness, reference 2025/1267/FPA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.