High Pow Extension is a 16 MW onshore wind project in North West. The applicant or operator on record is REG Windpower. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2013/0519.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2013 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2013-12-24.
Registered planning capacity; not measured generation.
High Pow Extension is a 16 MW onshore wind project in North West. The applicant or operator on record is REG Windpower. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2013/0519.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.