East & South of Angel Centre, Osbaston, Shropshire, TF6 6QZ
High Ercall Solar Farm is a 49.9 MW solar farm project in West Midlands. The applicant or operator on record is Assured Asset Solar 1 Limited. Planning permission has been granted as of August 2023 and it is awaiting construction. The determining authority is Telford and Wrekin, β¦
Consented / Approved
Project stageConsented
PlanningJan 2023 (completed)
ConsentedAug 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-09-18.
Registered planning capacity; not measured generation.
High Ercall Solar Farm is a 49.9 MW solar farm project in West Midlands. The applicant or operator on record is Assured Asset Solar 1 Limited. Planning permission has been granted as of August 2023 and it is awaiting construction. The determining authority is Telford and Wrekin, reference TWC/2023/0064.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Assured Asset Solar 1 Limited
Owner / operator
Assured Asset Solar 1 Limited
Year consented
2023
Location
East & South of Angel Centre, Osbaston, Shropshire, TF6 6QZ