Solar Farm

High Ercall Solar Farm

East & South of Angel Centre, Osbaston, Shropshire, TF6 6QZ

High Ercall Solar Farm is a 49.9 MW solar farm project in West Midlands. The applicant or operator on record is Assured Asset Solar 1 Limited. Planning permission has been granted as of August 2023 and it is awaiting construction. The determining authority is Telford and Wrekin, …

Consented / Approved
50 MW
Installed Capacity

πŸ“‹ Project Overview

High Ercall Solar Farm is a 49.9 MW solar farm project in West Midlands. The applicant or operator on record is Assured Asset Solar 1 Limited. Planning permission has been granted as of August 2023 and it is awaiting construction. The determining authority is Telford and Wrekin, reference TWC/2023/0064.

Site Schematic

SUBSTATION ? ha Β· 49.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)50 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAssured Asset Solar 1 Limited
Owner / operatorAssured Asset Solar 1 Limited
Year consented2023
LocationEast & South of Angel Centre, Osbaston, Shropshire, TF6 6QZ
RegionWest Midlands
Coordinates52.7674383Β°N, 2.5889567Β°W

πŸ“… Project Timeline