High Blackwoodyards Farm is a 2 MW onshore wind project in Scotland. The applicant or operator on record is HBY 2. The planning application was refused. The determining authority is South Lanarkshire, reference P/19/1712.…

Refused
Project stageRefused
  1. PlanningNov 2019 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2020-10-07.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

High Blackwoodyards Farm is a 2 MW onshore wind project in Scotland. The applicant or operator on record is HBY 2. The planning application was refused. The determining authority is South Lanarkshire, reference P/19/1712.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperHBY 2
Owner / operatorHBY 2
LocationHigh Blackwoodyards Farm, B7086 From Boghead Kirkmuirhil, Lesmahagow, To Deadwaters Bridge Boghead, Lanark, Strathclyde, Lanarkshire, ML11 0JH
RegionScotland
Coordinates55.6558052Β°N, 3.9575569Β°W

Additional published register fields

Registered technologyWind Onshore
No. of Turbines2
Height of Turbines (m)160

πŸ“… Project Timeline

2019-11-27