High Barns Wind Turbine is a 1.5 MW onshore wind project in Eastern. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is Tendring, reference 14/00932/FUL.β¦
Refused
Project stageRefused
PlanningJul 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-04-01.
Registered planning capacity; not measured generation.
High Barns Wind Turbine is a 1.5 MW onshore wind project in Eastern. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is Tendring, reference 14/00932/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Renewable Energy Systems (RES)
Owner / operator
Renewable Energy Systems (RES)
Location
The Lodge Plough Road Great Bentley Colchester Essex CO7 8RP, Essex