πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Hespin Wood Materials Recovery Facility, Wavell Drive - Solar Panels

Hespin Wood Materials Recovery Facility Hespin Wood Waste Management Park, Lancashire, CA6 4BJ

Hespin Wood Materials Recovery Facility, Wavell Drive - Solar Panels is a solar farm project in North West. The applicant or operator on record is Cumbria Waste Management Limited. Planning permission has been granted as of November 2024 and it is awaiting construction. The deter…

Consented / Approved
Project stageConsented
  1. PlanningOct 2024 (completed)
  2. ConsentedNov 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-12-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

πŸ“‹ Project Overview

Hespin Wood Materials Recovery Facility, Wavell Drive - Solar Panels is a solar farm project in North West. The applicant or operator on record is Cumbria Waste Management Limited. Planning permission has been granted as of November 2024 and it is awaiting construction. The determining authority is Cumberland, reference 2596899.

Site Schematic

SUBSTATION ? ha Β· MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCumbria Waste Management Limited
Owner / operatorCumbria Waste Management Limited
Year consented2024
LocationHespin Wood Materials Recovery Facility Hespin Wood Waste Management Park, Lancashire, CA6 4BJ
RegionNorth West
Coordinates54.9529584Β°N, 2.992878Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2024-10-08
2024-11-21