Hertford Industrial Estate Caxton Hill, Hertfordshire, SG13 7NE
Hertford Industrial Estate, Caxton Hill - Solar Panels is a 0.37 MW solar farm project in Eastern. The applicant or operator on record is Marbank Construction Limited. The application has been withdrawn or the scheme abandoned. The determining authority is East Hertfordshire, refβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2024 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2024-08-27.
Registered planning capacity; not measured generation.
Hertford Industrial Estate, Caxton Hill - Solar Panels is a 0.37 MW solar farm project in Eastern. The applicant or operator on record is Marbank Construction Limited. The application has been withdrawn or the scheme abandoned. The determining authority is East Hertfordshire, reference 3/24/1192/PNPV.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.370 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Marbank Construction Limited
Owner / operator
Marbank Construction Limited
Location
Hertford Industrial Estate Caxton Hill, Hertfordshire, SG13 7NE