π Project Overview
Haxted Mead, Lingfield - Solar Farm is a 50 MW solar farm project in South East. The applicant or operator on record is Haxted Mead Solar Farm Limited. The scheme is currently in the planning system, submitted July 2025. The determining authority is Tandridge, reference 2025/644.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 50 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Haxted Mead Solar Farm Limited |
| Owner / operator | Haxted Mead Solar Farm Limited |
| Location | Haxted Mead, Lingfield, Kent, TN8 6PX |
| Region | South East |
| Coordinates | 51.1910425Β°N, 0.023476Β°E |