Is located between the villages of Hawthorn, Murton and Cold Hesledon, County Durham
Hawthorn Wind Farm is a 7.5 MW onshore wind project in North East. The applicant or operator on record is SLP Energy. The application has been withdrawn or the scheme abandoned. The determining authority is County Durham, reference PLAN/2008/0319.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningApr 2008 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2011-09-13.
Registered planning capacity; not measured generation.
Hawthorn Wind Farm is a 7.5 MW onshore wind project in North East. The applicant or operator on record is SLP Energy. The application has been withdrawn or the scheme abandoned. The determining authority is County Durham, reference PLAN/2008/0319.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
7.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
SLP Energy
Owner / operator
SLP Energy
Location
Is located between the villages of Hawthorn, Murton and Cold Hesledon, County Durham