π Project Overview
Hatherton Lodge Farm, Hunsterson Road - Solar Farm is a 12.5 MW solar farm project in North West. The applicant or operator on record is Noventum Power Limited. Planning permission has been granted as of June 2025 and it is awaiting construction. The determining authority is Cheshire East, reference 24/5074/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 13 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Noventum Power Limited |
| Owner / operator | Noventum Power Limited |
| Year consented | 2025 |
| Location | Hatherton Lodge Farm,Hunsterson Road, Hatherton, Cheshire, CW5 7RA |
| Region | North West |
| Coordinates | 53.0231585Β°N, 2.4613593Β°W |