Haslemere Industrial Estate Pig Lane Bishops Stortford, Hertfordshire, CM23 3HG
Haslemere Industrial Estate, Pig Lane - Solar Panels is a 0.3 MW solar farm project in Eastern. The applicant or operator on record is Stagecoach Group Plc. The planning application was refused. The determining authority is East Hertfordshire, reference 3/23/1062/PNPV.β¦
Refused
Project stageRefused
PlanningJun 2023 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2023-06-16.
Registered planning capacity; not measured generation.
Haslemere Industrial Estate, Pig Lane - Solar Panels is a 0.3 MW solar farm project in Eastern. The applicant or operator on record is Stagecoach Group Plc. The planning application was refused. The determining authority is East Hertfordshire, reference 3/23/1062/PNPV.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.300 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Stagecoach Group Plc
Owner / operator
Stagecoach Group Plc
Location
Haslemere Industrial Estate Pig Lane Bishops Stortford, Hertfordshire, CM23 3HG