Harrods Distribution Centre, Unit 1, Mill Lane, Thatcham, Berkshire, RG19 4AL
Harrods Distribution Centre, Mill Lane - Solar Array is a 1.6 MW solar farm project in South East. The applicant or operator on record is Private Developer. Planning permission has been granted as of February 2023 and it is awaiting construction. The determining authority is Westβ¦
Consented / Approved
Project stageConsented
PlanningDec 2022 (completed)
ConsentedFeb 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-03-10.
Registered planning capacity; not measured generation.
Harrods Distribution Centre, Mill Lane - Solar Array is a 1.6 MW solar farm project in South East. The applicant or operator on record is Private Developer. Planning permission has been granted as of February 2023 and it is awaiting construction. The determining authority is West Berkshire, reference 22/02986/FULMAJ.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Private Developer
Owner / operator
Private Developer
Year consented
2023
Location
Harrods Distribution Centre, Unit 1, Mill Lane, Thatcham, Berkshire, RG19 4AL