πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Harestanes Wind Farm Extension

located within the Forest of Ae, Dumfries and Galloway

Harestanes Wind Farm Extension is a 14 MW onshore wind project in Scotland. The applicant or operator on record is Scottish Power Renewables. The planning application was refused. The determining authority is Scottish Government (S36).…

Refused
Project stageRefused
  1. PlanningNov 2013 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2016-04-22.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

14.000 MW
Registered Capacity

πŸ“‹ Project Overview

Harestanes Wind Farm Extension is a 14 MW onshore wind project in Scotland. The applicant or operator on record is Scottish Power Renewables. The planning application was refused. The determining authority is Scottish Government (S36).

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)14.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperScottish Power Renewables
Owner / operatorScottish Power Renewables
Locationlocated within the Forest of Ae, Dumfries and Galloway
RegionScotland
Coordinates55.3025086Β°N, 3.5724421Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines7

πŸ“… Project Timeline

2013-11-13