Harbour Farm Havenside Hedon, East Riding of Yorkshire, HU12 8HH
Harbour Farm - Solar Farm is a 42 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Grupotec. The scheme is currently in the planning system, submitted September 2025. The determining authority is East Riding of Yorkshire, reference 25/02255/STβ¦
In Planning
Project stageIn planning
PlanningSep 2025 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2025-10-17.
Registered planning capacity; not measured generation.
Harbour Farm - Solar Farm is a 42 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Grupotec. The scheme is currently in the planning system, submitted September 2025. The determining authority is East Riding of Yorkshire, reference 25/02255/STPLFE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
42.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Grupotec
Owner / operator
Grupotec
Location
Harbour Farm Havenside Hedon, East Riding of Yorkshire, HU12 8HH