πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Hangar - Solar PV Panels

Hangar 219 President Way Luton, Bedfordshire, LU2 9NW

Hangar - Solar PV Panels is a 0.57 MW solar farm project in Eastern. The applicant or operator on record is EDF Energy Renewables. The scheme is currently in the planning system, submitted March 2022. The determining authority is Luton, reference 22/00188/LAWP.…

Revised
Project stageSuperseded by a new application
  1. PlanningMar 2022 (completed)
  2. Superseded by a new application (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2022-03-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.570 MW
Registered Capacity

πŸ“‹ Project Overview

Hangar - Solar PV Panels is a 0.57 MW solar farm project in Eastern. The applicant or operator on record is EDF Energy Renewables. The scheme is currently in the planning system, submitted March 2022. The determining authority is Luton, reference 22/00188/LAWP.

Site Schematic

SUBSTATION ? ha Β· 0.57 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.570 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEDF Energy Renewables
Owner / operatorEDF Energy Renewables
LocationHangar 219 President Way Luton, Bedfordshire, LU2 9NW
RegionEastern
Coordinates51.8847151Β°N, 0.373358Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Are they re-applying (New REPD Ref)11496

πŸ“… Project Timeline

2022-03-23