Thanet Earth Barrow Man Road Birchington, Kent, CT7 0AX
Hanet Earth, Barrow Man Road - Solar Panel Array is a 1 MW solar farm project in South East. The applicant or operator on record is Beba Energy Uk Limited. Planning permission has been granted as of October 2022 and it is awaiting construction. The determining authority is Thanetβ¦
Consented / Approved
Project stageConsented
PlanningAug 2022 (completed)
ConsentedOct 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-10-27.
Registered planning capacity; not measured generation.
Hanet Earth, Barrow Man Road - Solar Panel Array is a 1 MW solar farm project in South East. The applicant or operator on record is Beba Energy Uk Limited. Planning permission has been granted as of October 2022 and it is awaiting construction. The determining authority is Thanet, reference PN12/TH/22/1136.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Beba Energy Uk Limited
Owner / operator
Beba Energy Uk Limited
Year consented
2022
Location
Thanet Earth Barrow Man Road Birchington, Kent, CT7 0AX