Hall Farm Church Street Alfreton, Derbyshire, DE55 7AH
Hall Farm Solar Farm is a 49.99 MW solar farm project in East Midlands. The applicant or operator on record is Kronos Solar. The planning application was refused. The determining authority is Amber Valley, reference AVA/2020/1224.β¦
Refused
Project stageRefused
PlanningJan 2021 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2021-12-14.
Registered planning capacity; not measured generation.
Hall Farm Solar Farm is a 49.99 MW solar farm project in East Midlands. The applicant or operator on record is Kronos Solar. The planning application was refused. The determining authority is Amber Valley, reference AVA/2020/1224.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.990 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Kronos Solar
Owner / operator
Kronos Solar
Location
Hall Farm Church Street Alfreton, Derbyshire, DE55 7AH