Hadyard Hill
, east of Girvan
, South Ayrshire, Strathclyde
Hadyard Hill extension is a 88 MW onshore wind project in Scotland. The applicant or operator on record is Scottish and Southern Energy (SSE). The application has been withdrawn or the scheme abandoned. The determining authority is Scottish Government (S36), reference EC00003118.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningApr 2015 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2017-11-30.
Registered planning capacity; not measured generation.
Hadyard Hill extension is a 88 MW onshore wind project in Scotland. The applicant or operator on record is Scottish and Southern Energy (SSE). The application has been withdrawn or the scheme abandoned. The determining authority is Scottish Government (S36), reference EC00003118.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
88.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Scottish and Southern Energy (SSE)
Owner / operator
Scottish and Southern Energy (SSE)
Location
Hadyard Hill
, east of Girvan
, South Ayrshire, Strathclyde