Guilton Farm, Ash - Solar Panels is a 0.27 MW solar farm project in South East. The applicant or operator on record is Mansfield. Planning permission has been granted as of January 2026 and it is awaiting construction. The determining authority is Dover, reference 25/01300.β¦
Consented / Approved
Project stageConsented
PlanningDec 2025 (completed)
ConsentedJan 2026 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-02-24.
Registered planning capacity; not measured generation.
Guilton Farm, Ash - Solar Panels is a 0.27 MW solar farm project in South East. The applicant or operator on record is Mansfield. Planning permission has been granted as of January 2026 and it is awaiting construction. The determining authority is Dover, reference 25/01300.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.