πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Guilton Farm, Ash - Solar Panels

Guilton Farm, Ash, Canterbury, Kent, CT3 2HR

Guilton Farm, Ash - Solar Panels is a 0.27 MW solar farm project in South East. The applicant or operator on record is Mansfield. Planning permission has been granted as of January 2026 and it is awaiting construction. The determining authority is Dover, reference 25/01300.…

Consented / Approved
Project stageConsented
  1. PlanningDec 2025 (completed)
  2. ConsentedJan 2026 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-02-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.270 MW
Registered Capacity

πŸ“‹ Project Overview

Guilton Farm, Ash - Solar Panels is a 0.27 MW solar farm project in South East. The applicant or operator on record is Mansfield. Planning permission has been granted as of January 2026 and it is awaiting construction. The determining authority is Dover, reference 25/01300.

Site Schematic

SUBSTATION ? ha Β· 0.27 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.270 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMansfield
Owner / operatorMansfield
Year consented2026
LocationGuilton Farm, Ash, Canterbury, Kent, CT3 2HR
RegionSouth East
Coordinates51.2781024Β°N, 1.2685146Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-12-06
2026-01-29