Solar Farm

Greybarn Solar Energy Farm

Greybarn Solar Energy Farm Land At Bramford, Flowton And Burstall, Suffolk, IP19

Greybarn Solar Energy Farm is a 41.5 MW solar farm project in Eastern. The applicant or operator on record is Statkraft UK. The scheme is currently in the planning system, submitted March 2022. The determining authority is Mid Suffolk, reference DC/22/01243.…

In Planning
Project stageIn planning
  1. PlanningMar 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2024-10-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

41.500 MW
Registered Capacity

πŸ“‹ Project Overview

Greybarn Solar Energy Farm is a 41.5 MW solar farm project in Eastern. The applicant or operator on record is Statkraft UK. The scheme is currently in the planning system, submitted March 2022. The determining authority is Mid Suffolk, reference DC/22/01243.

Site Schematic

SUBSTATION ? ha Β· 41.5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)41.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperStatkraft UK
Owner / operatorStatkraft UK
LocationGreybarn Solar Energy Farm Land At Bramford, Flowton And Burstall, Suffolk, IP19
RegionEastern
Coordinates52.0725575Β°N, 1.0317796Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID9105
Mounting Type for SolarGround
Solar Site Area (sqm)600000

πŸ“… Project Timeline

2022-03-21