Greybarn Solar Energy Farm Land At Bramford, Flowton And Burstall, Suffolk, IP19
Greybarn Solar Energy Farm is a 41.5 MW solar farm project in Eastern. The applicant or operator on record is Statkraft UK. The scheme is currently in the planning system, submitted March 2022. The determining authority is Mid Suffolk, reference DC/22/01243.β¦
In Planning
Project stageIn planning
PlanningMar 2022 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2024-10-08.
Registered planning capacity; not measured generation.
Greybarn Solar Energy Farm is a 41.5 MW solar farm project in Eastern. The applicant or operator on record is Statkraft UK. The scheme is currently in the planning system, submitted March 2022. The determining authority is Mid Suffolk, reference DC/22/01243.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
41.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Statkraft UK
Owner / operator
Statkraft UK
Location
Greybarn Solar Energy Farm Land At Bramford, Flowton And Burstall, Suffolk, IP19