Samphill Solar Farm, Greenfield Road, Westoning, Bedfordshire, MK45 4SP
Greenfield Road - Samphill Solar Farm is a 43.45 MW solar farm project in Eastern. The applicant or operator on record is Anesco Limited. The scheme is currently in the planning system, submitted June 2021. The determining authority is Central Bedfordshire, reference CB/21/02583/β¦
Revised
Project stageSuperseded by a new application
PlanningJun 2021 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2025-08-08.
Registered planning capacity; not measured generation.
Greenfield Road - Samphill Solar Farm is a 43.45 MW solar farm project in Eastern. The applicant or operator on record is Anesco Limited. The scheme is currently in the planning system, submitted June 2021. The determining authority is Central Bedfordshire, reference CB/21/02583/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
43.450 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Anesco Limited
Owner / operator
Anesco Limited