Greenfield Road - Samphill Solar Farm is a 38.37 MW solar farm project in Eastern. The applicant or operator on record is Anesco Limited. The planning application was refused. The determining authority is Central Bedfordshire, reference CB/25/02017/FULL.…

Refused
Project stageRefused
  1. PlanningJun 2025 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2026-04-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

38.370 MW
Registered Capacity

πŸ“‹ Project Overview

Greenfield Road - Samphill Solar Farm is a 38.37 MW solar farm project in Eastern. The applicant or operator on record is Anesco Limited. The planning application was refused. The determining authority is Central Bedfordshire, reference CB/25/02017/FULL.

Site Schematic

SUBSTATION ? ha Β· 38.37 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)38.370 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAnesco Limited
Owner / operatorAnesco Limited
LocationSamphill Solar Farm, Greenfield Road, Westoning, Bedfordshire, MK45 4SP
RegionEastern
Coordinates51.9707226Β°N, 0.4722092Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Are they re-applying (Old REPD Ref) 9184
Solar Site Area (sqm)628200