Onshore Wind

Green Burn Wind Farm

land at Blackhall Farm and Shieldrum Farm, approximately 11km north-west of Alyth and 5km north-east of Bridge of Cally in Perth and Kinross, Tayside

Green Burn Wind Farm is a 33 MW onshore wind project in Scotland. The applicant or operator on record is ABO Wind. The application has been withdrawn or the scheme abandoned. The determining authority is Perth and Kinross, reference 15/01691/FLM.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedFeb 2018 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2021-12-07.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

33.000 MW
Registered Capacity

πŸ“‹ Project Overview

Green Burn Wind Farm is a 33 MW onshore wind project in Scotland. The applicant or operator on record is ABO Wind. The application has been withdrawn or the scheme abandoned. The determining authority is Perth and Kinross, reference 15/01691/FLM.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)33.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperABO Wind
Owner / operatorABO Wind
Year consented2018
Locationland at Blackhall Farm and Shieldrum Farm, approximately 11km north-west of Alyth and 5km north-east of Bridge of Cally in Perth and Kinross, Tayside
RegionScotland
Coordinates56.6848552Β°N, 3.3749243Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)3
No. of Turbines11
Height of Turbines (m)115

πŸ“… Project Timeline

2015-10-07
2018-02-20