πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Great Shelfin Farm

LAND AT GREAT SHELFIN FARM MULLACOTT CROSS ILFRACOMBE DEVON EX34 8ND, Devon

Great Shelfin Farm is a 6.9 MW onshore wind project in South West. The applicant or operator on record is British Telecom. The application has been withdrawn or the scheme abandoned. The determining authority is North Devon, reference 49825.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningMar 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2012-03-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.900 MW
Registered Capacity

πŸ“‹ Project Overview

Great Shelfin Farm is a 6.9 MW onshore wind project in South West. The applicant or operator on record is British Telecom. The application has been withdrawn or the scheme abandoned. The determining authority is North Devon, reference 49825.

Site Schematic

SOUTH WEST Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)6.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBritish Telecom
Owner / operatorBritish Telecom
LocationLAND AT GREAT SHELFIN FARM MULLACOTT CROSS ILFRACOMBE DEVON EX34 8ND, Devon
RegionSouth West
Coordinates51.1794742Β°N, 4.1156139Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2.3
No. of Turbines3

πŸ“… Project Timeline

2010-03-12