Gravel Farm, Cleeve - Solar Farm is a 32 MW solar farm project in South West. The applicant or operator on record is Relay Gravel Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Forest of Dean, reference P1773/22/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2024-04-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

32.000 MW
Registered Capacity

πŸ“‹ Project Overview

Gravel Farm, Cleeve - Solar Farm is a 32 MW solar farm project in South West. The applicant or operator on record is Relay Gravel Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Forest of Dean, reference P1773/22/FUL.

Site Schematic

SUBSTATION ? ha Β· 32 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)32.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRelay Gravel Limited
Owner / operatorRelay Gravel Limited
LocationGravel Farm Cleeve, Gloucestershire, GL14 1RF
RegionSouth West
Coordinates51.8128434Β°N, 2.3977285Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)475700

πŸ“… Project Timeline

2023-01-26