Grantham Meres Leisure Centre, Trent Road, Grantham, Lincolnshire, NG31 7XQ
Grantham Meres Leisure Centre, Trent Road - Solar PV System is a 0.25 MW solar farm project in East Midlands. The applicant or operator on record is Grantham Meres Leisure Centre. The scheme is currently in the planning system, submitted August 2024. The determining authority is β¦
In Planning
Project stageIn planning
PlanningAug 2024 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2024-09-16.
Registered planning capacity; not measured generation.
Grantham Meres Leisure Centre, Trent Road - Solar PV System is a 0.25 MW solar farm project in East Midlands. The applicant or operator on record is Grantham Meres Leisure Centre. The scheme is currently in the planning system, submitted August 2024. The determining authority is South Kesteven, reference S24/1466.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.250 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Grantham Meres Leisure Centre