Gores Wind Farm is a 16 MW onshore wind project in Eastern. The applicant or operator on record is Peterborough Wind Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference 13/00431/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningApr 2013 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2015-11-05.
Registered planning capacity; not measured generation.
Gores Wind Farm is a 16 MW onshore wind project in Eastern. The applicant or operator on record is Peterborough Wind Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference 13/00431/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.