Goosey Lodge - Solar Farm is a 10.5 MW solar farm project in East Midlands. The applicant or operator on record is Wykes Engineering Limited Goosey Lodge. Planning permission has been granted as of May 2023 and it is awaiting construction. The determining authority is Bedford, reference 22/01520/MAF.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 11 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Wykes Engineering Limited Goosey Lodge |
| Owner / operator | Wykes Engineering Limited Goosey Lodge |
| Year consented | 2023 |
| Location | South & E/O Goosey Lodge Farm, Wymington Lane, Wymington, Rushden, Northamptonshire, NN10 0SD |
| Region | East Midlands |