Land 2040M NE Of Bulreanrob, Lybster, Highland, KW3 6BY
Golticlay Wind Farm 2 is a 13.2 MW onshore wind project in Scotland. The applicant or operator on record is RWE Renewables UK Limited. The scheme is currently in the planning system. The determining authority is Scottish Government (S36).β¦
In Planning
Project stageIn planning
Planning (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: No Application Required.
Official register: July 2026
Recorded status: No Application Required. Source record updated 2026-02-23.
Registered planning capacity; not measured generation.
Golticlay Wind Farm 2 is a 13.2 MW onshore wind project in Scotland. The applicant or operator on record is RWE Renewables UK Limited. The scheme is currently in the planning system. The determining authority is Scottish Government (S36).
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
13.200 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
RWE Renewables UK Limited
Owner / operator
RWE Renewables UK Limited
Location
Land 2040M NE Of Bulreanrob, Lybster, Highland, KW3 6BY