πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Golticlay Wind Farm 2

Land 2040M NE Of Bulreanrob, Lybster, Highland, KW3 6BY

Golticlay Wind Farm 2 is a 13.2 MW onshore wind project in Scotland. The applicant or operator on record is RWE Renewables UK Limited. The scheme is currently in the planning system. The determining authority is Scottish Government (S36).…

In Planning
Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: No Application Required.

Official register: July 2026

Recorded status: No Application Required. Source record updated 2026-02-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

13.200 MW
Registered Capacity

πŸ“‹ Project Overview

Golticlay Wind Farm 2 is a 13.2 MW onshore wind project in Scotland. The applicant or operator on record is RWE Renewables UK Limited. The scheme is currently in the planning system. The determining authority is Scottish Government (S36).

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)13.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRWE Renewables UK Limited
Owner / operatorRWE Renewables UK Limited
LocationLand 2040M NE Of Bulreanrob, Lybster, Highland, KW3 6BY
RegionScotland
Coordinates58.3465705Β°N, 3.3284977Β°W

Additional published register fields

Registered technologyWind Onshore
CfD Allocation RoundAR7a
CfD Capacity (MW)13.2
Turbine Capacity (MW)6.6
No. of Turbines2
Height of Turbines (m)180