Solar Farm

Glebe Farm Solar Park

Glebe Farm, Tolland, Taunton, Somerset, TA4 3PR

Glebe Farm Solar Park is a 4.2 MW solar farm project in South West. The applicant or operator on record is AEE Renewables. The planning application was refused. The determining authority is Somerset, reference 41/13/0001.…

Refused
Project stageRefused
  1. PlanningApr 2013 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2013-12-10.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.200 MW
Registered Capacity

πŸ“‹ Project Overview

Glebe Farm Solar Park is a 4.2 MW solar farm project in South West. The applicant or operator on record is AEE Renewables. The planning application was refused. The determining authority is Somerset, reference 41/13/0001.

Site Schematic

SUBSTATION ? ha Β· 4.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAEE Renewables
Owner / operatorAEE Renewables
LocationGlebe Farm, Tolland, Taunton, Somerset, TA4 3PR
RegionSouth West
Coordinates51.0814025Β°N, 3.2840341Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Are they re-applying (Old REPD Ref) 1389

πŸ“… Project Timeline

2013-04-08