πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Glebe Farm, Curdridge Lane - Solar Farm

Glebe Farm, Curdridge Lane, Waltham Chase, Southampton, Hampshire, SO32 2LQ

Glebe Farm, Curdridge Lane - Solar Farm is a 10 MW solar farm project in South East. The applicant or operator on record is Glebe Farm Energy Limited. The scheme is currently in the planning system, submitted May 2025. The determining authority is Winchester, reference 25/01050/F…

In Planning
Project stageIn planning
  1. PlanningMay 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2025-07-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

10.000 MW
Registered Capacity

πŸ“‹ Project Overview

Glebe Farm, Curdridge Lane - Solar Farm is a 10 MW solar farm project in South East. The applicant or operator on record is Glebe Farm Energy Limited. The scheme is currently in the planning system, submitted May 2025. The determining authority is Winchester, reference 25/01050/FUL.

Site Schematic

SUBSTATION ? ha Β· 10 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)10.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGlebe Farm Energy Limited
Owner / operatorGlebe Farm Energy Limited
LocationGlebe Farm, Curdridge Lane, Waltham Chase, Southampton, Hampshire, SO32 2LQ
RegionSouth East
Coordinates50.9354966Β°N, 1.2121841Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID17266
Mounting Type for SolarGround
Solar Site Area (sqm)214483

πŸ“… Project Timeline

2025-05-22