Gleadell Bulk Terminal Alexandra Road South Immingham Docks Immingham, Lincolnshire, DN40 3QG
Gleadell Bulk Terminal, Alexandra Road South - Solar Panels is a 0.78 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Associated British Ports. Planning permission has been granted as of April 2023 and it is awaiting construction. The determiβ¦
Consented / Approved
Project stageConsented
PlanningFeb 2023 (completed)
ConsentedApr 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-04-25.
Registered planning capacity; not measured generation.
Gleadell Bulk Terminal, Alexandra Road South - Solar Panels is a 0.78 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Associated British Ports. Planning permission has been granted as of April 2023 and it is awaiting construction. The determining authority is North Lincolnshire, reference DM/0141/23/PNSOL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.780 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Associated British Ports
Owner / operator
Associated British Ports
Year consented
2023
Location
Gleadell Bulk Terminal Alexandra Road South Immingham Docks Immingham, Lincolnshire, DN40 3QG