Girvan Distillery, Bridge Mill Girvan - Anaerobic Digestion Extension is a 10 MW bioenergy / waste project in Scotland. The applicant or operator on record is Grissan Carrick Limited. Planning permission has been granted as of February 2025 and it is awaiting construction. The de…

Consented / Approved
Project stageConsented
  1. PlanningNov 2024 (completed)
  2. ConsentedFeb 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-03-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

10.000 MW
Registered Capacity

πŸ“‹ Project Overview

Girvan Distillery, Bridge Mill Girvan - Anaerobic Digestion Extension is a 10 MW bioenergy / waste project in Scotland. The applicant or operator on record is Grissan Carrick Limited. Planning permission has been granted as of February 2025 and it is awaiting construction. The determining authority is South Ayrshire, reference 24/00827/APP.

πŸ”§ Technical Specifications

Capacity (MW)10.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGrissan Carrick Limited
Owner / operatorGrissan Carrick Limited
Year consented2025
LocationGirvan Distillery, Jnct At Bridge Mill Girvan To Main Street, Dailly, Girvan, Strathclyde, Ayrshire, KA26 9PT
RegionScotland
Coordinates55.2607103Β°N, 4.833419Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2024-11-20
2025-02-14