πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Gibson Lane, South Melton - Anaerobic Digestion Plant

S/O Wind Turbines, Gibson Lane, South Melton, Ferriby, East Riding of Yorkshire, HU14 3HH

Gibson Lane, South Melton - Anaerobic Digestion Plant is a bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Melton Energy Tech. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshi…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2022-05-11.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

πŸ“‹ Project Overview

Gibson Lane, South Melton - Anaerobic Digestion Plant is a bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Melton Energy Tech. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshire, reference 18/03116/CM.

πŸ”§ Technical Specifications

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMelton Energy Tech
Owner / operatorMelton Energy Tech
LocationS/O Wind Turbines, Gibson Lane, South Melton, Ferriby, East Riding of Yorkshire, HU14 3HH
RegionYorkshire and Humber
Coordinates53.723672Β°N, 0.5312741Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2018-10-23