Gelligaer B Wind Farm
Mynydd Fochriw
Fochriw
Mid Glamorgan, Mid Glamorgan
Gelligaer 'B' Wind Farm is a 9.8 MW onshore wind project in Wales. The applicant or operator on record is South Wales Power / SWALEC. The application has been withdrawn or the scheme abandoned. The determining authority is Merthyr Tydfil, reference T/99/0295.β¦
Withdrawn
Project stageWithdrawn / abandoned
Planning (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2002-06-26.
Registered planning capacity; not measured generation.
Gelligaer 'B' Wind Farm is a 9.8 MW onshore wind project in Wales. The applicant or operator on record is South Wales Power / SWALEC. The application has been withdrawn or the scheme abandoned. The determining authority is Merthyr Tydfil, reference T/99/0295.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
9.800 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
South Wales Power / SWALEC
Owner / operator
South Wales Power / SWALEC
Location
Gelligaer B Wind Farm
Mynydd Fochriw
Fochriw
Mid Glamorgan, Mid Glamorgan