Gedling Colliery AD

Land At Gedling Colliery Arnold Lane Gedling, Nottinghamshire, NG4 4HF

Gedling Colliery AD is a 3 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Biogen (formerly Tamar Energy). The application has been withdrawn or the scheme abandoned. The determining authority is Gedling, reference 2014/1025NCC.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-03-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.000 MW
Registered Capacity

πŸ“‹ Project Overview

Gedling Colliery AD is a 3 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Biogen (formerly Tamar Energy). The application has been withdrawn or the scheme abandoned. The determining authority is Gedling, reference 2014/1025NCC.

πŸ”§ Technical Specifications

Capacity (MW)3.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBiogen (formerly Tamar Energy)
Owner / operatorBiogen (formerly Tamar Energy)
Year consented2014
LocationLand At Gedling Colliery Arnold Lane Gedling, Nottinghamshire, NG4 4HF
RegionEast Midlands
Coordinates52.9891921Β°N, 1.0887191Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2014-08-22
2014-10-02