Land South Of Gaywood Farm, Hole Lane, Edenbridge, Kent, Kent, TN8 6SL
Gaywood Farm is a 7.5 MW battery storage project in South East. The applicant or operator on record is AMDC Energy / Balanced Grid Solutions. The planning permission has expired. The determining authority is Sevenoaks, reference 17/02668/FUL.β¦
Expired
Project stageConsent lapsed
PlanningAug 2017 (completed)
ConsentedMar 2018 (completed)
Consent lapsed (project stopped here)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Expired.
Official register: July 2026
Recorded status: Planning Permission Expired. Source record updated 2020-07-27.
Registered planning capacity; not measured generation.
Gaywood Farm is a 7.5 MW battery storage project in South East. The applicant or operator on record is AMDC Energy / Balanced Grid Solutions. The planning permission has expired. The determining authority is Sevenoaks, reference 17/02668/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
7.500 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMDC Energy / Balanced Grid Solutions
Owner / operator
AMDC Energy / Balanced Grid Solutions
Year consented
2018
Location
Land South Of Gaywood Farm, Hole Lane, Edenbridge, Kent, Kent, TN8 6SL