πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Gascoigne Wood Colliery - STOR

Gascoigne Wood Mine, Lennerton lane, South Milford, North Yorkshire, LS25 6LH

Gascoigne Wood Colliery - STOR is a 19.8 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is REG Biopower. The application has been withdrawn or the scheme abandoned. The determining authority is North Yorkshire, reference 2015/0674/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedFeb 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-10-25.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

19.800 MW
Registered Capacity

πŸ“‹ Project Overview

Gascoigne Wood Colliery - STOR is a 19.8 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is REG Biopower. The application has been withdrawn or the scheme abandoned. The determining authority is North Yorkshire, reference 2015/0674/FUL.

πŸ”§ Technical Specifications

Capacity (MW)19.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperREG Biopower
Owner / operatorREG Biopower
Year consented2016
LocationGascoigne Wood Mine, Lennerton lane, South Milford, North Yorkshire, LS25 6LH
RegionYorkshire and Humber
Coordinates53.7809052Β°N, 1.2031749Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2015-06-30
2016-02-11