πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Gascoigne Wood Colliery - Peak Power

Land at the Former Gascoigne Wood Colliery, Hagg Lane, Leeds, North Yorkshire, LS25 6LH

Gascoigne Wood Colliery - Peak Power is a 20 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is First Renewable. The application has been withdrawn or the scheme abandoned. The determining authority is North Yorkshire, reference 2015/1034…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2016-12-22.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

20.000 MW
Registered Capacity

πŸ“‹ Project Overview

Gascoigne Wood Colliery - Peak Power is a 20 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is First Renewable. The application has been withdrawn or the scheme abandoned. The determining authority is North Yorkshire, reference 2015/1034/FUL.

πŸ”§ Technical Specifications

Capacity (MW)20.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFirst Renewable
Owner / operatorFirst Renewable
LocationLand at the Former Gascoigne Wood Colliery, Hagg Lane, Leeds, North Yorkshire, LS25 6LH
RegionYorkshire and Humber
Coordinates53.7808024Β°N, 1.1998837Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2015-09-14