Bioenergy / Waste

Gameslack Farm

Beverley Road, Fimber Nr Wetwang, Driffield,, Humberside, YO25 9LT

Gameslack Farm is a 17.5 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is East Yorkshire Power. The scheme is currently in the planning system, submitted March 2010. The determining authority is East Riding of Yorkshire, reference 10/01…

Revised
Project stageSuperseded by a new application
  1. PlanningMar 2010 (completed)
  2. Superseded by a new application (project stopped here)
  3. ConsentedApr 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2016-06-10.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

17.500 MW
Registered Capacity

πŸ“‹ Project Overview

Gameslack Farm is a 17.5 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is East Yorkshire Power. The scheme is currently in the planning system, submitted March 2010. The determining authority is East Riding of Yorkshire, reference 10/01123/STOUTE.

πŸ”§ Technical Specifications

Capacity (MW)17.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEast Yorkshire Power
Owner / operatorEast Yorkshire Power
Year consented2011
LocationBeverley Road, Fimber Nr Wetwang, Driffield,, Humberside, YO25 9LT
RegionYorkshire and Humber
Coordinates54.0263298Β°N, 0.6097398Β°W

Additional published register fields

Registered technologyBiomass (dedicated)
Are they re-applying (New REPD Ref)5674

πŸ“… Project Timeline

2010-03-19
2011-04-08