Galvin Road is a 1.6 MW solar farm project in South East. The applicant or operator on record is Barclays Bank / Innogy (previously BELECTRIC Solar). The application has been withdrawn or the scheme abandoned. The determining authority is Slough, reference P/00348/008.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJul 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2017-02-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.600 MW
Registered Capacity

πŸ“‹ Project Overview

Galvin Road is a 1.6 MW solar farm project in South East. The applicant or operator on record is Barclays Bank / Innogy (previously BELECTRIC Solar). The application has been withdrawn or the scheme abandoned. The determining authority is Slough, reference P/00348/008.

Site Schematic

SUBSTATION ? ha Β· 1.6 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBarclays Bank / Innogy (previously BELECTRIC Solar)
Owner / operatorBarclays Bank / Innogy (previously BELECTRIC Solar)
Year consented2015
Location672 Galvin Road, Slough, Berkshire, SL1 4AN
RegionSouth East
Coordinates51.5161541Β°N, 0.6168017Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2015-04-24
2015-07-06