π Project Overview
Funtley Solar Photovoltaic PV Farm is a 10.5 MW solar farm project in South East. The applicant or operator on record is Private Developer. The scheme is currently in the planning system, submitted November 2021. The determining authority is Winchester, reference HCC/2021/0701.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 11 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Private Developer |
| Owner / operator | Private Developer |
| Location | The Funtley Refuse Tip (Former), Titchfield Lane, Wickham, Fareham, Hampshire, PO15 6DY |
| Region | South East |
| Coordinates | 50.8817775Β°N, 1.2192452Β°W |