Fulwood Grange Farm is a 5 MW solar farm project in East Midlands. The applicant or operator on record is Fulwood Grange Solar Farm Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Ashfield, reference V/2015/0455.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2015 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedNov 2015 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2020-05-21.
Registered planning capacity; not measured generation.
Fulwood Grange Farm is a 5 MW solar farm project in East Midlands. The applicant or operator on record is Fulwood Grange Solar Farm Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Ashfield, reference V/2015/0455.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.